Employer cost calculator
What one worker really costs you each month, local or foreign: salary plus employer EPF, SOCSO, EIS and the HRD Corp levy.
Transport, meal and other fixed monthly allowances.
Optional for Malaysians in this tool. Always charged for foreign workers. Your employer will say whether it is on your payslip.
Total over 12 months: RM 27,576.60
What the worker takes home
After the worker's own EPF, SOCSO, EIS, PCB and LINDUNG 24 Jam.
- The HRD Corp levy applies to Malaysian employees only.
- Not included: bonuses, overtime, medical benefits, and any cost outside salary and statutory contributions.
Uses the same rules as EasyHR payroll, so this matches a real payslip for the same inputs. SOCSO and EIS use the standard band formula (no contribution table loaded).
Worked out on your device. What you type is never sent to us and never stored. Estimate only. This is not tax, legal or financial advice. Check with your payroll practitioner, KWSP, PERKESO and LHDN before relying on a figure.
Run this for every employee, every month
EasyHR works out EPF, SOCSO, EIS, PCB and LINDUNG 24 Jam for your whole team, produces payslips and tracks foreign worker permits and FOMEMA.